You don't have javascript enabled. Good luck with that.
Pencarian
Wali Kota Harapkan Pembangunan Waduk Dipercepat

E. Jakarta Mayor Wants Reservoir Construction to Be Accelerated

East Jakarta Mayor, Bambang Musyawardana hopes reservoir construction in his administration area could be accelerated. Because this thing could decrease the numbers of flood points in East Jakarta.

I hope land acquisition process could run fast. Thus water absorption areas could increase and inundation could be gone

"Actually, reservoir is in Jakarta Water Resources Dept.'s domain, but because the location is in our territory, of course we also take the responsibility by helping to facilitate the construction," he said, Wednesday (4/26).

According to him, the remaining project is dredging the former excavation ground, especially Kampung Rambutan 1 Reservoir. But the auction must be done again by Jakarta Water Resources Dept.

Vice Gov. Asked Officers to Stay Responsive Overcoming Flood

Land acquisition will be also done in Waduk Pondok Ranggon and Giri Kencana Cilangkap. This is needed to expand the reservoir in those two locations.

"I hope land acquisition process could run fast. Thus water absorption areas could increase and inundation could be gone," he closed.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5481 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4618 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1825 personTiyo Surya Sakti
  4. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye1033 personAldi Geri Lumban Tobing
  5. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye1022 personFakhrizal Fakhri